BUS-03 Control layer

Process management

The ability to describe a process, find waste and bottlenecks, improve it and embed a new norm so that the result is repeatable without heroics.

coating BBusiness and results3 indicators6 levels
Target level · manager4 out of 4
ClusterBusiness, results and processes

Definition

BT360 v2.0.0

The ability to describe a process, find waste and bottlenecks, improve it and embed a new norm so that the result is repeatable without heroics.

What is it made up of?

3 INDICATORS
  • 01Describing and measuring the process
  • 02Finding waste and bottlenecks
  • 03Improving and embedding the norm

Behavior levels 0–5

MANAGER'S GOAL - 4
Lv.LabelDescriptor
0AbsentThe process is not described; the result depends on individuals; waste is invisible; improvements are random; errors repeat.
1Poorly developedDescribes the process superficially; sees obvious waste; improves individual steps; the norm does not stick; people go back to the old way.
2UnderdevelopedCan draw the process; measures individual indicators; finds bottlenecks from complaints; improvements are not systemic; the result is unstable.
3Normally developedDescribes the process and metrics; finds waste and bottlenecks; improves and checks the effect; embeds the norm; the result is reproducible.
4Highly developed leader's goalBuilds a system of continuous improvement; links the process to customer value; eliminates causes rather than symptoms; involves the people who do the work; scales improvements.
5OverdevelopedThe process becomes an end in itself: bureaucracy, regulations for the sake of regulations, optimization for the sake of optimization; the customer and the purpose get lost; people resist.

How is it measured?

coating B
Partial coverageThe test produces a hypothesis. The final level is after behavioral confirmation.
Tools

SJT - BT360 situational test: provides a hypothesis about judgments in work situations and does not replace observation, 360 and interviews.

The Likert system describes the managerial context, but not the quality of the process. The main method is to map the process, metrics and check the effect of improvement.

Development Actions

5 CATEGORIES
Diagnostics

Likert system and a process audit: map, metrics, waste, bottlenecks, cost.

Training

Workshop “Process Improvement”: flow map, waste, metrics, cause-and-effect links, embedding.

Practice

Pick one process, measure it, find two sources of waste, improve it and check the effect within 6 weeks.

Feedback

Discuss with the people who run the process and with the customer: what changed, what got worse.

Wednesday

Introduce a regular process review in the team and the right of the person doing the work to propose improvements.

What to watch

INTERVIEW AND BEHAVIOR
Question 1What process did you improve? How was the effect measured?
Question 2What do you do when improvement returns to old behavior?
ObservationIn the case: does it see losses, connects it with value, does it reinforce the norm.
Sign of hypertrophyBureaucracy and optimization for the sake of optimization.