PER-10 Core

Adaptability to uncertainty

The ability to act productively when information is incomplete, rules change and familiar solutions stop working. Includes the willingness to change the plan without losing the goal.

coating BPersonal effectiveness3 indicators6 levels
Target level · manager4 out of 4
ClusterPersonal effectiveness and self-regulation

Definition

BT360 v2.0.0

The ability to act productively when information is incomplete, rules change and familiar solutions stop working. Includes the willingness to change the plan without losing the goal.

What is it made up of?

3 INDICATORS
  • 01A calm attitude to incomplete information
  • 02Flexible plan changes while keeping the goal
  • 03Acting under changing rules

Behavior levels 0–5

MANAGER'S GOAL - 4
Lv.LabelDescriptor
0AbsentRequires complete certainty and instructions; stops when conditions change; clings to the previous plan; any ambiguity triggers anxiety or aggression.
1Poorly developedActs under uncertainty only under pressure; changes the plan with difficulty and after resistance; loses effectiveness for a long time in new conditions.
2UnderdevelopedCopes with small changes; waits for instructions when the shift is serious; can change tactics but at the cost of pace and quality; anxiety gets in the way of seeing options.
3Normally developedActs on incomplete information while recording assumptions; changes tactics while keeping the goal; quickly restores working rhythm after the rules change; asks questions instead of guessing.
4Highly developed leader's goalIs at home in uncertainty; builds scenarios and tests hypotheses; changes course without drama or loss of trust; helps the team keep the meaning; uses uncertainty as a space of opportunities.
5OverdevelopedConstantly changes course without need; bounces chaotically between options; presents the absence of a plan as flexibility; the team cannot tell where it is heading; execution suffers.

How is it measured?

coating B
Partial coverageThe test produces a hypothesis. The final level is after behavioral confirmation.
Tools

BFI-44 gives openness to experience and neuroticism, PSS-10 - stress, resilience - risk taking. These are explanatory scales; the level is determined by behavior in a changing case.

Development Actions

5 CATEGORIES
Diagnostics

BFI-44 (openness, neuroticism), PSS-10 and the hardiness scale; review of three situations where the rules changed.

Training

Training 'Working in Uncertainty': assumptions, scenarios, hypothesis-testing cycles, managing anxiety.

Practice

Take on a project with incomplete inputs and keep a log of assumptions and checks; revisit the plan weekly.

Feedback

Discuss with the manager where you wait for excessive certainty; ask for context rather than instructions.

Wednesday

Introduce short planning cycles and explicit assumptions in the team instead of long fixed plans.

What to watch

INTERVIEW AND BEHAVIOR
Question 1Tell us about a project where the inputs changed on the fly. How did you rebuild?
Question 2How do you feel when there is not enough information to make a decision? What are you doing?
ObservationIn a case with incomplete data: acts or freezes; does it capture assumptions? does the plan change with a new introduction?
Sign of hypertrophyChaotic change of course under the guise of flexibility.