Execution control
The ability to keep tasks moving toward the result: see status, detect deviations, intervene on time and not replace control with total checking.
Definition
BT360 v2.0.0The ability to keep tasks moving toward the result: see status, detect deviations, intervene on time and not replace control with total checking.
What is it made up of?
3 INDICATORS- 01Transparency of status and metrics
- 02Early detection of deviations
- 03Intervening without micromanagement
Behavior levels 0–5
MANAGER'S GOAL - 4| Lv. | Label | Descriptor |
|---|---|---|
| 0 | Absent | Does not know the status of tasks; learns about failure after the fact; there is no control or it is chaotic; promises are not checked. |
| 1 | Poorly developed | Controls through verbal reports; checks everything manually; reacts only to obvious failure; micromanagement alternates with no control at all. |
| 2 | Underdeveloped | Holds regular status meetings; sees deviations but intervenes late; controls the process; metrics are formal. |
| 3 | Normally developed | Builds transparent status and metrics; spots deviations early; agrees on checkpoints; intervenes on triggers; looks at causes, not just the result. |
| 4 | Highly developed leader's goal | Creates an early-warning system; controls results rather than activity; intervenes precisely and minimally; teaches the team self-control; keeps trust. |
| 5 | Overdeveloped | Control turns into total checking: daily reports, duplication, distrust; the team spends time on reporting; initiative disappears; the leader becomes a bottleneck. |
How is it measured?
coating BThe LBDQ measures work structure and attention to people; the Blake-Mouton grid measures the production/people balance. It's style, not quality control; an audit of real practices is needed.
Development Actions
5 CATEGORIESLBDQ (initiating structure) and the managerial grid; an audit of current checkpoints and their value.
Workshop “Control Without Micromanagement”: metrics, triggers, status meetings, deviation reviews.
Rebuild control in one project: one metric, one status, three intervention triggers.
Ask the team where control helps and where it gets in the way; remove two unnecessary reports.
Introduce a transparent status board in the team and the rule “escalate on a trigger, not on mood”.